VIS-ENG has developed the ability to find creative solutions for difficult projects. Whether the obstacles are the physical terrain, environmentally sensitive zones, tough regulatory frameworks, or tight financial constraints, we have found ways to integrate solutions to improve the overall project.
Listed below are some sample projects that give an understanding of the Vis-ENG approach and the breadth of our experience. The projects will be tagged with categories to give a sense of the types of projects Vis-ENG has worked on. We will also be adding additional projects that we have proudly been involved in.
A multiphase mixed residential use project that VIS-ENG members aided in achieving a CD rezoning with large park and trail community amenity. The development consists of a 354-acre parcel with a water treatment booster pump station, two sensitive creek crossings and a future water reservoir. This project has involved the design of all civil services, roads, preliminary approvals site preparation construction and inspection. Future phases bring in innovative stormwater features, multi-use trail.
Client: Primex
Grafton Fish Passage Culvert
Grafton Fire Pump Station
Grafton Lands, Bowen Island, BC
A multi-phase residential single-family parcel development with partial communal septic, a new well and a water treatment/pump station with a future water reservoir. Additionally, this project will have a partially assisted living site for those with special needs. A phased integration of park and open space with trails adds to the community amenity but also as a value-added benefit to the residents. This project has involved the design of all civil services, roads, pump stations, preliminary approvals site preparation construction and inspection.
VIS-ENG members were part of the original team assisting with the rezoning and continue to be the Engineer of Record for all the detailed Civil, Pump Station, sediment and erosion control and Stormwater Management elements of the project and managed the tender and construction of the works.
Client: Pareto Capital
Categories: Current, Integrated Mixed Use Development Projects
Arbutus Ridge Development, Bowen Island, BC
Arbutus Ridge Well and Water Treatment Pump Station, Bowen Island, BC
Arbutus Ridge Development, Bowen Island, BC
A commercial sightseeing and nature adventure experience which has involved the design of all civil services, well and ground water systems, water treatment facility, reservoirs, roads/parking lots, highway access, preliminary approvals and site preparation construction and inspection.
VIS-ENG members were the original and continue to be the Engineer of Record for all the detailed Civil, sediment and erosion control and Stormwater Management elements of the project and managed the tender and construction of the works
Client: Sea to Sky Gondola Corp
Categories: Current, Commercial Venture
Sea to Sky Gondola Highway Access, water systems, Sewer Systems
Sea to Sky Gondola, Squamish, BC
A full community development, from rezoning through PLA and in phase 1 highway dedication, park dedications, trails, well upgrades and protection strategies, communal septic fields and pedestrian trails.
VIS-ENG is responsible for coordinating work between the surveyors, environmental consultants, Health Authority, Archeolgy Branch, Island Trust, SCRD, and MOTI to create a subdivision to establish a legal framework for the community to endure. VIS-ENG lead the rezoning, PLA and subdivision and providing engineering review and design of the sewer system, water upgrades, access and general lot layouts working toward a central wastewater treatment system with Mangat Environmental.
Client: Convention of Baptist Churches of BC
Keats Island, Island Trust, Sunshine Coast, BC
Keats Island, Island Trust, Sunshine Coast, BC
A 50-acre residential development in a mountainside neighbourhood with tough terrain and stringent visual impact requirements from the municipality. This project has involved designing all civil services, roads, pump stations, reservoirs, ski area integration, preliminary approvals and site preparation construction and inspection.
VIS-ENG members were the originals and continue to be the engineers of record for all the detailed civil, sediment, and erosion control and stormwater management elements of the project. The main development is complete, and VIS-ENG will work on on-lot servicing, driveway design and stormwater management.
Client: Intrawest Resort Development Group, Eco Oasis Properties Ltd.
Categories: Current, Integrated Mixed Use Development Projects
Kadenwood Subdivision, Whistler, BC
Kadenwood Subdivision, Whistler, BC
Challenging Drainage and Storm Water on Mountain Slopes
A 700-acre, residential development on a mountainside neighbourhood with tough terrain and encroachments with rivers, highway, rail, hydro and creeks. The project is within SLRD and does not have any existing services. This project has involved the design of all civil services, roads, pump stations, reservoirs, creation of a CPCN, creation of an ISMP, bridges, preliminary approvals and site preparation, construction and inspection. We have provided project management for civil works, bridge construction, wetland restoration projects, site development, entry monuments, water systems and coordination with sewage treatment plant construction. The main development is now complete and VIS-ENG will be working on on-lot servicing, driveway design and stormwater management. VIS-ENG will be hired by the original developer to design the roads and services for the 12-unit duplex phase in the new year.
VIS-ENG members were one of the original, and continue to be on new phases, Engineer of record for all the detailed civil, sediment and erosion control and Stormwater Management elements of the project and have managed the tender and construction of the works to date.
Client: 28165 Yukon Inc.
Categories: Current, Integrated Mixed Use Development Projects
Rail and Green River Bridges Wedge Woods Subdivision, Whistler, BC
Wedge Woods Phase 6, Whistler, BC
A 240-acre mixed-use development with a full-service university, resident housing, market housing, sports field, pump station, equalization and pumping reservoir, wetlands, creek crossings and significant offsite works.
This project involved the design, approvals, construction and inspection of several kilometres of road, the grading and servicing of the core university buildings, grading for resident housing buildings, integration of a geothermal heat system, tying into the existing water system and adding an equalization reservoir, pump station and storage water for the domestic system.
VIS-ENG members were the original and continue to be the Engineer of record for all the preliminary and detailed Civil, sediment and erosion control and Stormwater Management elements of the project managed the tender and construction of the works and provided inspection on all ongoing and completed civil works. The main development is now complete, and VIS-ENG will be working on on-lot servicing, driveway design and stormwater management.
Client: Sea to Sky University Foundation
Quest University, Squamish, BC
Quest University, Squamish, BC